Plymouth Meeting

Kehoe Construction, Inc. was hired to cover an exposed gas line.  After erosion and sediment control measures were put into place, field personnel replaced soil over the gas line.  The next step was to create a concrete flow channel from the basin outflow and a rip-rap flow channel from the gas main to the existing stream.  All disturbed areas were restored to their original condition.